Certified Professional Program - New Building - To construct a 4-storey industrial and office building over two levels of underground parkade with repair garage/subsidiary office on the main/mezzanine floor; manufacturing on the 2nd floor; manufacturing/offices on the 3rd floor; and offices on the 4th floor. VBBL 2014 - Reviewed during the 2020 pandemic crisis. STAGE 1 - Excavation and Shoring issued on Mar. 12, 2020. STAGE 2 - Structure Only issued on June 11, 2020. STAGE 2 - REVISION #1 - Structural Changes (loading bay area) issued on Sept. 23, 2020. STAGE 3 - Full Construction issued on November 25th, 2020. STAGE 3 - REVISION #2 - To incorporate the missing Code compliance plans released at Stage 3 issued on Dec. 2, 2020. STAGE 3 - REVISION #3 - Interior and exterior changes on the following: Parking alterations (Level P1: 1 Small Car removed / Level P2: 1 Standard changed to 2 Small Car Stalls); - Level P1: End-Of-Trip facilities layout changes, and Loading Bay Grill- Shutter split configuration changed with the Exit door in the middle, along with the relocation aligning the stairs on exit route; - 4th Floor: added elevator stop; - Roof: Elevator penthouse raised and upper access ladder added; - Elevations: exterior alteration changes. Issued on Feb. 17, 2022.
1055 VERNON DRIVE, Vancouver, BC V6A 3P4 · Vancouver, BC
1
Units
—
Years
1
Passenger
0
Other kinds