Field Review - Addition / Alteration - #1200 - 12th floor (full floor) Interior alterations to provide improvements for the existing full floor office tenant on the 12th floor (#1200) of this existing commercial building. Scope of work: Demolish/construct partition walls, doors and frames. Remove t-bar ceilings and light fixtures. New universal washroom, floorings, millwork, electrical, plumbing and sprinkler work. REVISION #1: Reduce the scope to demo to shell space only for the entire floor to include elevator lobby and corridor. SEPARATE PERMIT IS REQUIRED FOR FUTURE TENANT IMPROVEMENT OR TO CHANGE THE USE - Oct 13/23 - LLL Letters of Assurance submitted: Schedule A and Architectural Schedule B by Rufina Wu, Architect, AIBC., 604.484.1593 Electrical Schedule B by Henry Doornberg, P.Eng., 403.313.8270 Plumbing/Mechanical Schedule B by Daniel Prescott, P.Eng., 604.255.1169 Building Sprinklered – Separate sprinkler permit required for proposed sprinkler work. E2 - Retrofit Path: 1 @ E2\t Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing). All energy upgrades will be checked during inspections stage. It is the applicant’s responsibility to identify and note all required upgrades including energy upgrades on their BP drawings at BP stage. \t\t\t\t\t\t\t\t\t\t\t\t\t\t
1185 W GEORGIA STREET, Vancouver, BC V6E 4E6 · Vancouver, BC
1
Units
—
Years
1
Passenger
0
Other kinds