ElevatorAtlas

Certified Professional Program - New Building - To construct a 7-storey (Z&D 6-storey) mixed use (Passive House) building consisting 1st storey - Retail use (shell only) and parking garage, 2nd storey - bike storage and loading area, 3rd to 7th storeys - 48 rental dwelling units under the Section Market Rental (Rental 100) Policy, all over one level of underground parking having vehicular access from the lane. All tenanted spaces require separate tenant improvement permits. Related to AL-2021-00096 to permit 7-storey building with wood frame construction with 3.2.1.2. slab construction to underside of retail and bike storage slab and applied 3.2.2.50. construction article. This permit has been reviewed under the 2019 Vancouver Building By-law (#12511). Building to be sprinklered to NFPA 13 requirements. Radio Antenna System to be installed in this building. STAGED CONSTRUCTION Stage 1 - Excavation & Shoring - Issued July 5 2021 Re-issued stage 1 on Aug 24: Previously issued superseded Excavation and Shoring dwgs. This revision corrects that. Date of most recent dwgs is June 15, 2021. RM Stage 2 - Full Structure - issued November 12, 2021 Stage 3 - Full Construction - issued December 15, 2022 Revision 1 - Change of Electrical Engineer of Record, from P.Eng. Chen to P.Eng. Grannary, effective January 13, 2023. - issued March 6, 2023 Revision 2 - Revision to Plumbing layout in parkade and Level 1. Revision to HVAC layout to all levels. - issued August 28, 2023 Revision 3 - Revisions to landscape drawings - issued November 23, 2023 Revision 4 - To add the AAV use in Passive House, related to AL-2-2023-00234 and to increase in height at roof parapet and elevator overrun per M/A DP-2024-00053. - issued February 23, 2024

3455 E HASTINGS STREET, Vancouver, BC V5K 2A5 · Vancouver, BC

1
Units
Years
1
Passenger
0
Other kinds

Equipment (1)