Field Review - Addition / Alteration - #1400 - 14th Floor Interior alterations to provide improvements to this new office tenant on the 14th floor (#1400) of this existing commercial building on site. Scope of work: Demo/construct interior walls. New millwork, glazing, paint, electrical and plumbing work to suit. REVISION #1: Remove walls, doors, maglock and all door hardware at the elevator lobby. Add new glazing at office hallway and new frameless glass door with electric strike/fob card. Increase of $4,000 in project cost. - Sept 2/25 - LLL TENANT: Larlee Rosenberg, Barrister & Solicitors Building Sprinklered – Building inspector to determine on site if a separate sprinkler permit is required. Energy checklist is currently no longer required with your Building Permit (BP) application. Some supporting documents are still required at BP stage, specifically Envelope and HVAC, if applicable. Service Water Heating and Lighting supporting documents, if applicable, must be submitted with your related trades permits (e.g. electrical and plumbing).
595 HOWE STREET, Vancouver, BC V6C 2T5 · Vancouver, BC
1
Units
—
Years
1
Passenger
0
Other kinds