ElevatorAtlas
Passenger elevatorinactive

Passenger elevator

at Field Review - Addition / Alteration - Interior demolition of this existing office tenancy in this existing commercial building on this site. Scope of work includes the removal of non-loadbearing partition walls on level 2 and level 3. OK for field review as per Jamie Zhang, Oct.23/17 Note: Separate building and occupancy permit(s) and ASHRAE compliance will be required for any future tenant improvements. Revision #1: Removal of convenient stairs connecting 2nd and 3rd floors, enclosure of interconnection on 2nd floor, install wall guard around enclosure on 3rd floor, raise floors to provide accessible ramps to be flush with existing elevator and with east exit stairs #2 on 3rd floor, and provide accessible ramps to be flush with floor to male washroom on 3rd floor. Notes: 1. Floor interconnection between 2nd and 3rd floors to remain inaccessible during work in progress. 2. Permit related to permit application BP-2017-05581 for exterior work. Revision #2: Install standpipe cabinet between the 2nd and 3rd floors. · 2015 MAIN STREET, Vancouver, BC V5T 4L8 · Vancouver, BC

Overview

Type
Passenger elevator
Drive
Installed
Manufacturer

Detailed specifications PRO

🔒

Pro feature

Inspection history, detailed specs, maintenance records, and more are available with ElevatorAtlas Pro.

Upgrade to Pro

14-day free trial. Plans from $99/month.

Inspection history PRO

🔒

Pro feature

Inspection history, detailed specs, maintenance records, and more are available with ElevatorAtlas Pro.

Upgrade to Pro

14-day free trial. Plans from $99/month.